Julian Mercier markJulian Mercier

September 2024

What the Site Says First

Reading

Every project the studio takes on begins with three full days on the land before any drawing is made. No sketches, no measurements, no notebooks except a small one for evening notes.

The first day is loud. You arrive with the brief in your head. The brief is loud. The site can barely get a word in.

The second day, the brief begins to soften. You start to notice the wind direction, the light, the part of the site that is already a path. You notice what the locals don't build on. You notice the slope nobody mentioned.

What the Site Says First — illustrationImage · Field

The wall, the hinge, the surface — the small thing that the essay actually concerns.

Continued

The third day is the quiet one. By the third day the brief is mostly gone. The site is finally talking. The shape of the building begins to suggest itself — not from the brief, not from the studio's preferences, but from the site itself.

Almost every project begins to draw itself on the third afternoon. Almost.

The clients sometimes ask whether they can come along. The answer is no. The site doesn't speak when the client is on it.

← PreviousOn PlasterNovember 2024Next →The Architect-Developer ModelJuly 2024